Benin
Agriculture and food safety
2023
41 573 M FCFA

COCA-COLA DONGA BOTTLING COMPANY SA’s project to set up and operate a brewery complex and can production line in the Sèmè Podji industrial zone, Benin.

Objectives

  • Exploit a brewery complex with an annual capacity of 920,000 hl, and install a 330-ml can production line with an annual production capacity of 260 million.

Financing
of the project

  • BOAD : 20000 M FCFA
  • Local banks : 7000 M FCFA
  • Shareholders' equity : 4573 M FCFA